AAFES Kadena Express

DC4 provided a complete MEP engineering design and construction administration package for an AAFES Express gas station and retail facility (with a Hunt Bros. pizza and Subway vendor inside) at Kadena Air Force Base in Okinawa, Japan. The design for this facility included DX RTUs and Split-Systems, building pressure management systems, lighting, controls, power, kitchen hoods/exhaust, high-wind restraint and coastal area restrictions, fuel-system controls and site lighting.

AAFES Ft. Hood Clear Creek Shopping Center

DC4 performed full MEP design and construction administration services in conjunction with Koegel Associates for a 265,000 sq.ft. retail facility consisting of a large big-box retail area, parking lot, strip mall, food court, warehouse and office/administration areas. The design for this facility was built around LEED certification. Retail/Vendor spaces in the mall and food court included Starbucks, Arby’s, GNC, Boston Market, Charley’s, Gamestop, a Pharmacy, a Dental Clinic, a Beauty/Hair Salon, a Nail and Spa Treatment space, and other various retailers.

AAFES Ft. Bragg Smoke Bomb Hill

DC4 performed full MEP design and construction administration services in conjunction with Koegel Associates to repair/remediate multiple existing HVAC issues that were causing discomfort to employees and patrons. Services included revising HVAC designs for multiple food-service vendors and a large food-court seating area.

AAFES Ft. Bliss Freedom Crossing

DC4 performed full MEP design and construction administration services in conjunction with Koegel Associates for a 150,000 sq.ft. retail facility consisting of a large big-box retail area, strip mall, food court, warehouse and office/administration areas. In addition, numerous “shell” buildings (6 total) were prepared for future tenants. The design for this facility was built around LEED certification.

AAFES Ft. Sam Houston PX Shopping Center

DC4 performed full MEP design and construction administration services in conjunction with Koegel Associates for a 210,000 sq.ft. retail facility consisting of a large big-box retail area, parking lot, strip mall, food court, warehouse and office/administration areas. The design for this facility was built around LEED certification. Retail/Vendor spaces in the mall and food court included Starbucks, Q’Doba, GNC, Freshens, Slim Chickens, Charley’s, Arby’s, Gamestop, a Pharmacy, a Dental Clinic, Nail/Spa/Beauty space, a Barber Shop, and other various retailers.

AAFES HQ Command Center HVAC

DETAILS


DC4 performed design and construction administration services in conjunction with Koegel Associates for the replacement of a 100-ton VAV air handler and associated ductwork, terminal units and control systems. The installation also included numerous energy saving strategies including demand control ventilation, variable capacity fans/compressors, temperature and pressure resets and economizers.

AAFES HQ Chiller Plant

DETAILS


DC4 performed design and construction administration services in conjunction with Koegel Associates for the replacement of three water-cooled chillers, three condenser water pumps and VFDs, and associated piping and control systems.

AAFES HQ Cooling Towers

DETAILS


DC4 performed design and construction administration services in conjunction with Koegel Associates for the replacement of three cooling towers, VFDs, side-stream basin filtration and associated piping and control systems.

AAFES HQ UPS Room Cooling

DETAILS


DC4 performed design and construction administration services in conjunction with Koegel Associates for the replacement of four UPS room CRAC units, four air-cooled condensers and associated piping, ductwork and controls.