AAFES HQ Command Center HVAC
DETAILS
DC4 performed design and construction administration services in conjunction with Koegel Associates for the replacement of a 100-ton VAV air handler and associated ductwork, terminal units and control systems. The installation also included numerous energy saving strategies including demand control ventilation, variable capacity fans/compressors, temperature and pressure resets and economizers.